Waste management guidance - paragraph 3 - operation of a scrap metal furnace under an IPC authorisation

Date published: 03 February 2009

Paragraph 3 allows the operation, under an authorisation granted under the Industrial Pollution Control Order, of a scrap metal furnace with a designed holding capacity of less than 25 tonnes and the loading or unloading of the furnace in connection with its operation. 

Back to top