Marine Licence ML2022009 Red Bay Pier

Date published: 08 August 2023

The proposed project involves remedial works to Red Bay Pier that are essential for its preservation. 

The proposed Works comprises installation of a new sheet pile wall around the head of the pier. The new wall will be 93m in length and installed approximately 1m seaward of the existing sheet pile wall. The area in between the existing and proposed sheet pile walls will be filled with concrete. The wall will be anchored at the top by raking ground anchors. A reinforced concrete capping beam will be constructed to connect the heads of the piles and transfer the horizontal anchor loads. It is anticipated that a small section of rock armour revetment at the seaward outer corner of the pier will be removed and temporarily relocated onsite for reinstatement following driving of the piles.    

Minor remedial woks to the existing masonry quay wall, in the form of re-pointing with lime mortar, will also be undertaken.

Details

Proposal Description

Reference: ML2022009
Project Type: Construction
Location: Red Bay Pier
Coordinates: D 24329 26075
Project Description: The proposed Works comprises installation of a new sheet pile wall around the head of the pier. The new wall will be 93m in length and installed approximately 1m seaward of the existing sheet pile wall. The area in between the existing and proposed sheet pile walls will be filled with concrete. The wall will be anchored at the top by raking ground anchors. A reinforced concrete capping beam will be constructed to connect the heads of the piles and transfer the horizontal anchor loads. It is anticipated that a small section of rock armour revetment at the seaward outer corner of the pier will be removed and temporarily relocated onsite for reinstatement following driving of the piles.    

 

Applicant: Causeway Coast and Glens Borough Council

Status: Active
Date Issued: 13/06/2023
Licence Start Date: 13/06/2023
Licence End Date: 29/02/2024