The project is for the construction of a new multi-purpose facility for berthing of cruise ships and for lay-by and transient storage of project cargo, break bulk & dry bulk during cruise ship off-season.
This project is subject to an Environmental Impact Assessment, and an Environmental Statement has been prepared.
Proposal Description
- Reference: ML2025053, ML2025054, ML2025055
- Project Type: Construction, Capital Dredge, Sea Disposal
- Location: Lands commonly known as D3, within Belfast Harbour Estate, opposite Victoria Terminal 4
- Coordinates: Works to take place within the rectilinear boundary of the four coordinates below:
Point A 337201, 378095
Point B 337417, 378667
Point C 337430, 378501
Point D 337176, 378147
- Project Description: This project involves three separate marine licence applications:
ML2025053: Marine Construction Licence for the construction of the marine aspects of the project. Development comprises the construction of 340m long solid quay with mooring dolphins, located at D3, within Belfast Harbour Estate, opposite Victoria Terminal 4.
ML2025054: Marine Capital Dredge Licence for the creation of a berthing pocket adjacent to D3 within Belfast Harbour Estate, by dredging to -9.8mCD, removing approximately 372,000m³ of material, with dredge works centered on Irish National Grid 337267 E, 378353 N
ML2025055: Marine Capital Dredge Sea Disposal Licence for the disposal of dredged material at the North Channel Disposal Ground, located within a 0.2 nautical mile radius of 54° 45.3’N 05° 29.6’W
- Applicant: Belfast Harbour Commissioners
- Status: Under Consideration
- Date Issued:
- Licence Start Date:
- Licence End Date:
Application documents:
- Marine Construction Licence Application Form
- Marine Capital Dredge Licence Application Form
- Marine Sea Disposal Licence Application Form
- sHRA
- WFD Assessment
- Non-Technical Summary
- Site Location Plan
Environmental Statement :
- Chapters 1 - 20 (20 documents)
- Appendices 1.1 - 19.1 (35 documents)
- Figures 5.1 - 13.2 (13 documents)
Documents
- Marine Construction Licence Application Form
- Marine Capital Dredge Licence Application Form
- Marine Dredge Sea Disposal Licence Application Form
- sHRA
- WFD Assessment
- Non-Technical Summary
- Site Location Plan
- ES - Chapter 1 - Introduction & Project Description
- ES - Chapter 2 - Alternatives & Site Selection - New Format
- ES - Chapter 3 - Project Scoping
- ES - Chapter 4 - Policies & Plans
- ES - Chapter 5 - Landscape & Visual
- ES - Chapter 6 - Marine Ecology
- ES - Chapter 7 - Air Quality
- ES - Chapter 8 - Noise and Vibration
- ES - Chapter 9 - Terrestrial Ecology and Ornithology
- ES - Chapter 10 - Flood Risk Water Quality
- ES - Chapter 11 - Coastal Processes and Hydrodynamic Modelling
- ES - Chapter 12 - Contaminated Land
- ES - Chapter 13 - Artificial Lighting
- ES - Chapter 14 - Traffic and Transport
- ES - Chapter 15 - Marine Archaeology & Cultural Heritage
- ES - Chapter 16 - Socio-Economics
- ES - Chapter 17 - Climate Change
- ES - Chapter 18 - Human Health
- ES - Chapter 19 - Risk of Major Accidents and Disasters
- ES - Chapter 20 - Interactions
- ES - Appendix 1.1 : Original Decision Notice and Stamped Approved Plans
- ES - Appendix 1.2 : EIA Scoping Request
- ES - Appendix 1.3 : Cumulative Developments
- ES - Appendix 1.4 : MLVAR2025026 - Marine Construction Licence
- ES - Appendix 1.4 : MLVAR2025027 - Marine Capital Dredge Licence
- ES - Appendix 1.4 : MLVAR2025028 - Marine Sea Disposal Licence
- ES - Appendix 3.1 : Scoping Consultation Responses
- ES - Appendix 5.1 : Photomontages Part1
- ES - Appendix 5.1 : Photomontages Part 2
- ES - Appendix 7.1 : Air Quality Technical Details 001
- ES - Appendix 8.1: Baseline Noise Monitoring Survey
- ES - Appendix 8.2 : Vessel Noise Monitoring Survey Appendix F01
- ES - Appendix 9.1.1 : Ecological Survey For Bats (2025)
- ES - Appendix 9.1.2 : Ecological Survey for Newts (2025)
- ES - Appendix 9.1.3 : NBN Records
- ES - Appendix 9.2.1_9.2.11 : Ornithology
- ES - Appendix 9.2.12 : D3 Desk Study & Pre-Construction Monitoring Report - updated version
- ES - Appendix 9.2.13 : D3 bird monitoring Interim Report Winter 202223
- ES - Appendix 9.2.14 : D3 bird monitoring Interim Report April to October 2022
- ES - Appendix 10.1 : D3 Sediment Sampling at Depth Results by location
- ES - Appendix 10.2 : D3 Surface Sediment Sampling Results BHC - 240715
- ES - Appendix 10.3 : IBM0592-SI-SK01 Vibrocore Results Rev E
- ES - Appendix 10.4 : Sub-Sample Testing of MBH15@3m depth
- ES - Appendix 10.5 : Samples at Depth (Nov 23 - Jan 24)
- ES - Appendix 10.5 : Surface Sampling (May 2023)
- ES - Appendix 11.1 : MIKE Modelling Module
- ES - Appendix 11.2 : Model Calibration
- ES - Appendix 12.1 : Environmental Site Assessment Contaminated Land
- ES - Appendix 13.1 : Lighting Proposal Summary
- ES - Appendix 14.1 : Traffic flow diagrams
- ES - Appendix 15.1 : Cultural Heritage Photograph Record
- ES - Appendix 17.1 : Greenhouse Gas Assessment
- ES - Appendix 17.2 : Climate Change Risk Assessment
- ES - Appendix 19.1 : Navigational Risk Assessment
- Figure 5.1 : Regional & National Character Areas
- Figure 5.2 : Landscape Character Areas
- Figure 5.3 : Landscape Designations
- Figure 5.4 : ZTV
- Figure 5.5 : Viewpoints Map
- Figure 7.1 : Air Quality Background and Sensitive Receptors
- Figure 8.1 : Sensitive Receptors and Noise Monitoring Locations
- Figure 8.2 : Worst Case Daytime Construction Noise Contour
- Figure 8.3 : Worst Case Night-time Construction Noise Contour
- Figure 9.1 : Designated Sites
- Figure 9.2 : Habitat Survey Results v03
- Figure 13.1 : Contoured LUX levels Hinterland & Access Road
- Figure 13.2 : Contoured LUX levels Access Road