Relocation of 1 no. outfall and construction of 1 no. additional outfall at D3, Belfast Harbour
- Reference: ML2026050
- Project Type: Construction
Location: Coordinates:
Outfall 1
X (Easting) 337711.611
Y (Northing) 378455.649
Latitude 54.635609
Longitude -5.8677399
Outfall 2
X (Easting) 337416.793
Y (Northing) 378443.473
Latitude 54.635582
Longitude -5.8723113Project Description:
• Remove rock armour.
• Reduce level to formation and install the geotextile.
• Place and compact aggregate.
• Pour in-situ concrete base (Note: This will be completed on a falling tide to ensure concrete has time to set, prior to being submerged by the tide).
• Lift precast concrete headwall into position and backfill around the toe.
• Install concrete pipes from the headwall back to the newly constructed chamber and backfill.
• Fix duckbill valve to the headwall.
• Re-lay rock armour around the headwall.- Applicant: Belfast Harbour